67 km
30 m








































67 km
30 m
26.02.26: Due to the recent storm, the exterior cladding of the aluminum façade on the top three floors at the hotel’s main entrance was affected by strong winds.Therefore, we would like to inform you that during the scheduled dates (13.03 – 20.03.26), installation works will be carried out. These works will NOT affect the normal operation of the building nor cause any noise that could disturb guests. However, they will have an impact on the exterior appearance — though not the interior — of the entrance area due to the installation of scaffolding.The scaffolding is erected on the terrace above the main entrance, so it does not affect hotel access or compromise safety.



















