18 km
800 m
Sand





18 km
800 m
Sand
confirmado 17.10
22.09.26: We would like to inform you that Meliá Jardines del Teide will be carrying out restoration and maintenance works on its main swimming pool, with the aim of ensuring the quality of our facilities and continuing to provide the best possible experience for our guests.The works are expected to last approximately 10 days, from 28th of September 2026 to 6th of October 2026, with the refilling of the pool scheduled to begin on 6 October 2026. During this period, the main swimming pool will be temporarily closed. Our guests will still be able to enjoy the heated swimming pool located in the upper area of the resort throughout the duration of the works. We would also like to clarify that the improvement works will mainly consist of repainting the pool after it has been emptied and prior to refilling it, and that there will be no noise or additional works during this period. In addition, during this period Pico Negro and The Level Lounge will also be temporarily closed. However, the gym, restaurants and all other areas of the hotel will remain fully operational.